Flagship Wharf

Charlestown, MA

GRLA has been working at Flagship Wharf since 2007, when a comprehensive study of the building envelope was performed.  At that time, the Board weighed options, and decided that leaks would be addressed as they arise.  Since 2009, GRLA’s BES team has sourced, designed repairs for, and provided construction services that have successfully addressed over two hundred leaks at this building.  Building envelope systems include an EPDM roof membrane; standing-seam copper roofing; brick masonry, precast concrete, curtain wall, windows, and plaza-deck waterproofing.